Pyeongtaek-Osong(CP-1) High Speed Railway, Korea BANDI won the T/K design for Pyeongtaek-Osong double-track line 1, the first project to introduce a 400km/h next-generation high-speed train, and performed the Detailed Design.

Panama Metro Line 3, Panama Participated in the Detailed Design of the largest infrastructure construction project in Panama, a 25.5 kilometer long railway bridge.

Gwangju-Songjeong ~ Suncheon(CP-1) single-tracked railway, Korea BANDI was responsible for the design of the Yeongsan River Bridge, a special bridge required to span the section of the Yeongsan National River.

Railway and Metro

Railway and
Metro

Railway and Metro

Railways and metros provide convenience and access to employment, education, health and leisure. BANDI meets the highest technical standards and the most stringent environmental requirements for most aspects of rail projects, including design and construction of new rail lines, and improvement and double-tracking of existing lines.

Design Phase

The optimal design of a railway bridge is carried out not only by optimizing the section for static structural analysis, but also by considering the dynamic effects of trains traveling at high speeds and the effects of bridge-track interaction. In addition, it is necessary to design considering all construction situations such as bridge erection methods and erection equipment operation.

BANDI's engineers have a high level of understanding of the dynamic characteristics of trains, the characteristics of long rails, and the design of bridge erection methods and erection equipment, all of which are important in the design of railway bridges.

Services Provided

BANDI provides services that meet the needs of clients from the design stage to site construction engineering, BIM implementation for design & construction, construction supervision, and contract management for all types of railway bridges and facilities such as high-speed rail and light rail, as well as general railway bridges.