
This project aims to establish a reliable internal power collection network for the ANMA Offshore Wind Farm, located in the offshore area near Anmado, on the west coast of Jeollanam-do. The objective is to ensure the stable transmission of electricity generated by offshore wind turbines to the offshore substation by developing rational and reliable design criteria for the inter-array cable (IAC) system within the wind farm.
Our company is responsible for the design of the inter-array cable (IAC) system, defining cable routes and design conditions by comprehensively considering offshore environmental conditions, seabed topography and geotechnical characteristics, constructability, and operational reliability. In addition, we provide engineering support across all project phases, including basic and detailed design review, procurement support, and installation engineering. Through this project, we strengthen our capabilities in offshore cable design and construction engineering while contributing to the long-term reliability of the power collection system and enhancing our competitiveness in future large-scale offshore wind power projects.
Project : Technical Assistance and Engineering Services for Anma Offshore Wind Submarine Cables
Client : Anma Offshore Wind Energy Co., Ltd.
Contractor : Taihan Cable & Solution
Project period : 2025.10 ~ 2028.12
14 JAN 2026